Laserfiche WebLink
Contractor Instructions <br /> CG 1 5444 Dry Creek Road <br /> I Ota Sacramento,CA 95838 <br /> 804288-2657 <br /> Contractor ELD Test Preparation Instructions & Checklists <br /> Newly installed UST systems must be tested and pass a CA approved enhanced leak <br /> detection (ELD) test prior to placing the system into service. The iota®VaporTite <br /> method has been determ' LD performance criteria and is allowable for <br /> post-installation testing se � LG 162-2_1). Thank you for considering this technology to <br /> meet your regulatory te <br /> .CS =0111owing checklists outline the items that must <br /> be submitted and completed in order to facilitate the iota® pre and final tests. <br /> .................­­­.................. ........................ <br /> ...................................... <br /> Important Regulatory Note <br /> The iota® ELD test method may only be utilized "post installation testing" for new <br /> construction and cannot be used for well proximity ELD testing. <br /> ....................... <br /> Carefully read and follow these instructions so your ELD testing project can be as <br /> smooth and cost effective as possible. Thank you for choosing iota®! <br /> ELD Cost Estimates & Proposals <br /> Submit Site Plans & Fuel System Information to CGRS <br /> The following documents and information will allow us to give you an accurate proposal <br /> and cost estimate as well as help us work with you to insure that the ELD testing goes <br /> smoothly and cost effectively on your installation project. <br /> • Fueling system site plan (electronic formats preferred) in AutoCAD VO4 or prior, <br /> pdf or hard copy formats. Drawings must be to scale. <br /> • Complete iota® Prc,'ect & System Information Forms (iota Project[nfo.xl s). <br /> • Familiarize yourself with the checklists and instructions below for pre-testing, final <br /> testing and contract and payment information. <br /> • Email or send a Site Plan and iota Project & System Information Form to <br /> cmurphy@cgrs.com to request a proposal and cost estimate. <br /> 0 Call or email for more information. CGS Contact Information <br /> Important Scheduling Note <br /> With all of the challenges and variables associated with installing fueling systems it is <br /> Ij often difficult to project and maintain an accurate installation schedule. This reality <br /> makes it challenging for us to adjust our schedule to accommodate our customers in a <br /> timely fashion. For this reason it is imperative that you contact us early in your project <br /> and communicate anticipated schedule changes to us immediately. Avoid scheduling <br /> regulatory inspections or other testing contractors on the same date as your iota final <br /> ELD test. This will help your project run smoothly and avoid unnecessary mobilization, <br /> stand-by costs and scheduling problems. <br /> .............._............ .......... <br />