Contractor Instructions <br /> November 11, 2007 <br /> Page 2 of 6 10ta <br /> iota® Pre-Testing <br /> Pre-testing with iota greatly reduces the possibility of expensive excavation and repair <br /> costs if any buried portion of the fueling system fails during the final test. It's important <br /> that you specifically use the iota pre test because during the iota pre test lower leak rate <br /> thresholds are used to further insure that the system passes the VaporTite final test with <br /> flying colors. If another helium method is being used, we can't be sure what thresholds <br /> are being used or if they'll meet the iota leak rate testing standards. <br /> Although the iota test method tests only the primary containment portion of the system, <br /> we also recommend that you strongly consider testing the secondary containment as <br /> well prior to backfilling. The primary goal of pre-testing is to identify any leaks in the <br /> system that will not be in an area where they can't be readily repaired (ie buried piping). <br /> iota pre-testing usually takes between one and two days, for an average 2-3 tank site. <br /> The following checklist should be followed by the contractor in order to allow for <br /> effective testing: <br /> Jere-Test Site Preparation Requirements — to be completed by the installation <br /> contractor prior to iota test crew arrival. <br /> O Avoid scheduling conflicts during pretests <br /> dates. i.e. fire marshal/local regulator ` <br /> O Piping will be exposed — not backfilled, ' ;7 <br /> no concrete poured. <br /> O Primary and secondary lines must be <br /> glued properly and terminated in sumps, M <br /> 7 <br /> UDC's and other transition sumps. <br /> 4 NY �m <br /> o Hydrostatic monitoring fluid should not ` <br /> be in the piping interstice at the time of <br /> pre-testing (if applicable). <br /> O Flex connections installed <br /> O No primary containment fittings exposed <br /> directly to backfill material (unused tank <br /> bungs and or risers should be in sump containment only) <br /> O Tank risers, buckets, ATG caps and adapters installed <br /> O Ball float removed and plugged with extractor fitting <br /> O iota test setups must be installed into piping at each secondary termination point <br /> after a ball valve iotaTestSetup.pdf. Test setups and ball valves must installed by <br /> the contractor prior }o CGRS' arrival to perform the pre and final test. The test <br /> setups may be mounted under the dispenser and left in the system or removed <br /> and reused by the contractor for future projects. Initially your test setups should <br /> be purchased from CGRS to insure that you are using the correct fittings. <br /> O Ball valves at each primary termination point with male air fitting to include line <br /> test port at pump <br />