My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Instructions <br /> November 11, 2007 <br /> Page 5 of 6 iota <br /> ENHANCED 1<s.:.t..K.t7ETP;.:L:T^':O`J <br /> o iota secondary connectors installed into secondary piping at all termination points <br /> (3/8" ID hoses and connections) — test setups and connectors can be purchased <br /> from CGRS at a cost of$30 per unit. <br /> o Hydrostatic monitoring fluid should not be in the piping interstice at the time of <br /> testing (if applicable). <br /> (Dispensers must be set in place on the fuel islands <br /> o Vapor and product impact valves should not connected to the dispensers and <br /> should be capped. <br /> o iota test setups connected to secondary access ports, labeled and secured. <br /> o Impact valve plugs -amoved with 3/8" male nipple and ball valve installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.