Laserfiche WebLink
Contractor Instructions <br /> November 11, 2007 <br /> Page 5 of 6 iota <br /> ENHANCED 1<s.:.t..K.t7ETP;.:L:T^':O`J <br /> o iota secondary connectors installed into secondary piping at all termination points <br /> (3/8" ID hoses and connections) — test setups and connectors can be purchased <br /> from CGRS at a cost of$30 per unit. <br /> o Hydrostatic monitoring fluid should not be in the piping interstice at the time of <br /> testing (if applicable). <br /> (Dispensers must be set in place on the fuel islands <br /> o Vapor and product impact valves should not connected to the dispensers and <br /> should be capped. <br /> o iota test setups connected to secondary access ports, labeled and secured. <br /> o Impact valve plugs -amoved with 3/8" male nipple and ball valve installed. <br />