My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2009-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:20:05 PM
Creation date
6/3/2020 9:44:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2014
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2009-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul 25 13 09: 10a Elite IV Contactors 12094 6342 p. 3 <br /> A so Multi-Sync installa i instruct" <br /> C_ <br /> FE. i <br /> ' F; 4 <br /> r V �f'D <br /> l n s <br /> or ue n m�� <br /> L <br /> This kit provides the Multi-Sync Repair for appiica:i! ns where the pipe is coming thr the <br /> sump wall straight or at an angle. J�U 2013 <br /> WARNING.,Prepare all surfaces to be bonded prior to comol ting Installation se <br /> 1 <br /> Failure to follow each step will void warranty&may resut•1 ,premature failureE <br /> IAL <br /> SZ BLS-xX IT <br /> Pagel This Kit alanlies for repairing:j1 j, I rte Sm ll Fittings <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow t air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. l <br /> 2, - W54a <br /> 2-- c (A <br /> STEP 1: Remove Old Boot STEP Z: (lean all Repair Components STEP 1 F ice&Dry Flt Insert&Sleeve <br /> • Remove clamps Clean all-repair components with DBC • Place:t e split cuff Insert over the pipe and test fit to <br /> • Cutaway old boot prior to installation insida `the existing fitting cuff. <br /> • Clean&sand fitting • Placl+t e split sleeve over the pipe&up to the cuff with <br /> Split Cleaner Split the 111 ort up <br /> Cuff Sleeve i <br /> Insert <br /> i Eccentricinsert Multi4yrc. <br /> Reducer <br /> a <br /> STEPS: Install The Sleeve STEP G:1 stall&Bond Eccentric Insert&Multi-Sync <br /> j Apply DBB v to outside of cuff. Redu:e Back Together <br /> Position the sleeve with the fill port at the top • Wri cl iccentrlc Insert around the pipe <br /> • Once you have the sleeve lined up correctly, • Wrz cl Auitl-Sync Reducer around the pipe <br /> tl r44 a slide onto cuff • Apply :Ip The to split area an Eccentric Insert,press <br /> i ends t:gether&clamp <br /> • Apply 'Ip Tite to split area on Multi-Sync Reducer, <br /> pre!s ids together&clamp <br /> STEP 4: Bond Sleeve&insert <br /> •. Apply Zip The to split cuff Insert. Use i of <br /> the clamps to hold in place while.curing. <br /> • Apply Zip The to the split sleeve and use 2 <br /> clamps to hold In-place while curing. <br /> • Leave these clamps in place for approx 30 <br /> minutes for curing before proceeding to • - -�*> .- <br /> ....the next step <br /> Set the Clamp the around the sleeve&over the <br />
The URL can be used to link to this page
Your browser does not support the video tag.