Laserfiche WebLink
MSZ BL-S-xx 0`5z _ 2or� _ <br /> Page 2 � �w <br /> Step 7: Install The Eccentric Insert&Multi-Sync Reducer <br /> • Dry fit the Eccentric insert.Make sure it fits properly over the pipe&inside the <br /> sleeve. <br /> • Dry fit the Multi-Sync Reducer <br /> • Adjust the positions so that they lineup properly with the Repair Sleeve&Pipe. <br /> Note: A proper fit will not cause extra pressure or force to the sleeve and will <br /> allow a longer lasting repair. <br /> • Once you have the part lined up correctly <br /> 1. Pull back the Multi-Sync Reducer&Eccentric Insert <br /> 2. Apply Zip Tite bonder all around the Eccentric Insert, <br /> 3. Slide Eccentric into the Repair sleeve in the proper position <br /> 4. Apply Zip Tite bonder all around the Multi-Sync Reducer re, <br /> 5. Slide the Multi-Sync Reducer into it's proper place <br /> 6. Set the Clamp the around the sleeve&over the Eccentric Insert and tighten <br /> "snugly". <br /> 7. Set clamp over reducer end on the pipe&tighten enough to create a seal <br /> around the pipe. <br /> Pipe Size Repair Kit Cuff Insert Eccentric/Insert Multi-Sync Clam <br /> 3/4"Rigid Conduit MSZ BLS-1.1 UIZ BLS 3.1x1.1 UIZ 3.5x2.6E URZ MS 2.6x1.1 16 <br /> 1"Rigid Conduit MSZ BLS-1.4 UIZ BLS 3.1x1.4 UIZ 3.5x2.6E URZ MS 2.6x1.4 20 <br /> 1"Flex Pie MSZ BLS-1.6 UIZ BLS 3.1x1.6 UIZ 3.5x1.6 N/A 24 <br /> Step 9: Fill With DBF 11,Insert Fill Plug TOOLS REQUIRED: <br /> • Assemble DAG&DBF 11(see instructions on DPM website). Gloves and Static Mixer <br /> • Purge 1-2 oz. 5/16"Nut driver (for Band Clamps) <br /> • Fill fitting slowly. DAG Caulk Gun (for DBF 11) <br /> Note: Use Remote Fill option If access is limited DAGP Caulk Gun (Pneumatic version for DBF II) <br /> • Insert fill plug when filling is completed. DAG III Caulk Gun (for DBB V) <br /> • Clean any spilled DBF II with DBC and dispose <br /> of remaining products per local requirements. <br /> PRODUCTS NEEDED: <br /> DBC Cleaner <br /> Note: After 1 hour DBB III Bonder Each =DBBVcomethe repair job may be DBF 11 Polysulfide Liquid Fill with a <br /> hydro-static tested DBB V Bonder(for Poly or Fiberglass sumps) <br /> FILL Volume: (per repair boot) <br /> Volume of DBF II needed = 9.5 oz <br /> Volume of DBB III needed = <br /> Remote Fill Option: Volume of DBB V needed = <br /> The following parts are available to order if you can not <br /> properly position the assembled DBF II applicator gun to Parts in kit: <br /> "fill"the repair. The Remote Fill parts provide a flexible Cuff Insert UIZ BLS 3.1xSee Table <br /> extension for the filling process. Sleeve USZ 3.50.5 <br /> RF Adapter 24"tube with male&female ends Eccentric Insert UIZ 3.5xSee Table <br /> RFA Tube-24 %2"Tubing in 24" lengths Multi-Sync Reducer URZ MS 2.6xSee Table <br /> RFA Tube %:"Tubing200' length roll 5 clamps 2#44,1#40,2#See Table <br /> In g Fill Port Plug RFA xPlug <br /> RFA TubexTube %2"Tube Coupling Install Instructions <br /> RFA xFemale %2"Tube-Female Fill Port end <br /> RFA xMale %z"Tube-.Male Fill Port end <br /> RFA xPlug %2"Tube-Male Plug for fill port <br />