Laserfiche WebLink
7 <br /> t <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING N 0 V 10 2 0114 <br /> Test Method Developed By: X Piping Manufacturer El Industry Standard ii Professional EnRineer <br /> 7 <br /> 11 Other(Specify) <br /> Test Method Used: X Pressure [I Vacuum El H��4 c­—, <br /> 0 Other(Specify) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Poly Plastic Poly Plastic <br /> Piping Manufacturer: APT APT <br /> Piping Diameter: I V2" I V2" <br /> Length of Piping Run: Approx.32' Approx.32' <br /> Product Stored: Fuel Oil Fuel Oil <br /> Method and location of Test boot at Test boot at <br /> piping-run isolation: Piping Sump Piping Sump <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 1:30 1:30 <br /> Initial Reading(RI): 5.1 Psi 5.4 Psi <br /> Test End Time: 2:30 2:30 <br /> 1 Final Reading(RF): 5.1 Psi 5.4 Psi <br /> Test Duration: I Hour I Hour <br /> Change in Reading(RF-R,): 1 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UST System for Emergency Generator. Suction Supply and Gravity Return. <br />