My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2009-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:20:05 PM
Creation date
6/3/2020 9:44:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2014
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2009-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> t <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING N 0 V 10 2 0114 <br /> Test Method Developed By: X Piping Manufacturer El Industry Standard ii Professional EnRineer <br /> 7 <br /> 11 Other(Specify) <br /> Test Method Used: X Pressure [I Vacuum El H��4 c—, <br /> 0 Other(Specify) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Poly Plastic Poly Plastic <br /> Piping Manufacturer: APT APT <br /> Piping Diameter: I V2" I V2" <br /> Length of Piping Run: Approx.32' Approx.32' <br /> Product Stored: Fuel Oil Fuel Oil <br /> Method and location of Test boot at Test boot at <br /> piping-run isolation: Piping Sump Piping Sump <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 1:30 1:30 <br /> Initial Reading(RI): 5.1 Psi 5.4 Psi <br /> Test End Time: 2:30 2:30 <br /> 1 Final Reading(RF): 5.1 Psi 5.4 Psi <br /> Test Duration: I Hour I Hour <br /> Change in Reading(RF-R,): 1 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UST System for Emergency Generator. Suction Supply and Gravity Return. <br />
The URL can be used to link to this page
Your browser does not support the video tag.