My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1987-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 4:35:41 PM
Creation date
6/3/2020 9:44:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1995
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1987-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
immediately(a) follow all operating procedures specified by Franchisor. <br />and connected piping system, unusual operating conditions. release detection signals am <br />environmental conditions suggesting a release may have occurred, and any spills and overfills thw <br />are not contained arW cleaned Lip; <br />(h) comply with all federal. state and local legal requirements relevant to the operation., <br />of the underground tanks and all amendments to any permit tD operate. <br />4. With respect to the operation of the underground storage tank system and monitoriffi. <br />equipment, Franchisee hereby acknowledges arid agrees: a <br />that ARCO has provided Franchisee with traftft on each of the hems described in <br />the attached Monitoring and Response Plan. <br />that Franchisee understood the content of the trakft, and asked any questions <br />necessary to facilitate understanding, <br />that Franchisee indicated to ARCO at the time of training any subjects addressed by <br />the training which Franchisee did not fully understand, and <br />that Franchisee received complete training and information necessary for <br />Franchisee to fully understand the subject of operating underground storage tanks. <br />5. Franchisor has provided Frambisee a copy of and Franchises agrees to maintain on th,-- <br />Premises the Certificate of Financial Responsibility (as required by the United State - <br />Environmental Protection Agency in Subpart H. 40 CFR. Part 280 and California Health and Sai;� <br />Code, - •: <br />:• Except to - ..xtent _ <br />y conflict with. or are less rigorous than the terms of tW.; <br />Amendment, all of the terms and conditions of the PMPA Agreement. as previously or hereafte, <br />2mended orsupplemented, <br />11/91 <br />ARCO Pwducts, Company <br />a division of Atlanti~fisldCompany <br />Franchisor <br />•J Y <br />lYVJVJ3M <br />
The URL can be used to link to this page
Your browser does not support the video tag.