Laserfiche WebLink
�1t1•lr •i l �l � i �• <br />l � <br />ARCO Facility i <br />AddressLf <br />This plan is designed to meet the monitoring and <br />Title 23, CCR. response r8QUIMMOM of _ <br />�ii •:1► • .i'M <br />The Secondarily contained used oil tank at this -« <br />leak detection <br />sensors and associated electronics. <br />Uquid sensors are inStalled in the annular space of the tark When required by local <br />irdinance. probes are installed In the manhole. Whenever <br />Jquid there is both -visual andthe presence of c <br />operatorcontrol panel. <br />The continuous electronic leak detec*3n system wfil be Inspected according to the <br />manufacturer,s instructions by an ' outside contractor once during each Calendar year. <br />On a daily basis the facility <br />A Inspect the control panel for visual _ •audible <br />• •:= a • `I <br />B. Record the inspection observations on the Daily Visual Monitoring Log (Form APPI <br />• c. <br />Whenever an alarm is cstationpersonnel <br />MaintenanceContact ARCO <br />previously provided. telephone number <br />•Make an entry in the RuCordable Discharge Log (Form APPC-765-1: attached) <br />indicating the action taken. <br />