My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. If Contamination exposure is encountered on this project, active ies will cease and proper <br /> notifications and procedures will be followed. <br /> 6. EXCLUDED WORK ZONE <br /> The boundary of the site shall be an excluded work zone. Personnel not actively involved in site <br /> work activities (other than inspectors from concerned regulatory agencies) shall not be allowed <br /> within the excluded work zone. <br /> 7. HAZARD COMMUNICATION <br /> ■ All personnel are to be familiar with this Site Work Health and Safety Plan, <br /> ■ Field supervisor will telephone for emergency service and notify office when needed. <br /> ■ Scott Co. employees and their subcontractors should briefly review Containment <br /> Solutions Site Safety Plan to assure all support items are in place and that individual <br /> scope of work is clear. <br /> ■ The field industrial hygienist shall keep in contact with the general contractor and <br /> Containment Solutions of any changing conditions which could effect health and safety. <br /> 8. PERSONAL SAFETY EQUIPMENT <br /> Support workers engaged in the inspection work shall wear/have available personal <br /> protective safety equipment as minimum: <br /> Level D <br /> ■ Hard hats <br /> ■ Safety glasses and/or goggles <br /> ■ Ear protection <br /> ■ Work boots <br /> ■ Gloves <br /> ■ Coveralls <br /> 9. FACILITY SAFETY EQUIEMENT <br /> The following safety equipment shall be continuously available at the job site: <br /> ■ First aid kit (20-unit) <br /> ■ Fire extinguishers (2)ABC <br /> ■ "No Smoking" signs <br /> ■ Barricade tape <br /> ■ Explosimeter (LEL)/Organic Vapor Analyzer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.