My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
scall 'CO. <br /> MECHANICAL CONTRACTORS <br /> 1717 Doolittle Drive <br /> P.O.Box 5555 <br /> San Leandro,California 94577-0655 <br /> (510)895-2333 <br /> Contractors License No.184480 <br /> It <br /> LJ <br /> February 9, 1999 E <br /> 10 1999 <br /> San Joaquin County Environmental Health <br /> -: 'IHr <br /> -A,,TH <br /> 304 East Weber Ave. 3rd Floor V.i� NTA <br /> - <br /> Stockton, CA 95202 pL--,,��AIT ./ SERVICES <br /> Attention: Doug Wilson <br /> Regarding: ARCO #2133 2908 Benjamin Holt Dr. Stockton, CA <br /> Supreme Singlewall Fiberglass Tank Entry And Inspection <br /> Gentlemen: <br /> Please find enclosed our permit package with appropriate permit forms, $234.00 <br /> fee, subcontractor qualifications and resumes. Also noted below is a brief <br /> chronology on how we intend to proceed with the project. <br /> As you are aware Scott Co. has been contracted by ARCO Products Co. to enter <br /> and inspect one Supreme (1) 10000 gallon single wall fiberglass Owens Corning <br /> Tank. <br /> Upon approval of our permit package from San Joaquin County Environmental <br /> Health and Stockton Fire Department we will schedule an official date with the <br /> local agencies; our tentative date for entry is February 23, 1999. <br /> Prior to the entry date Scott Co. will remove the concrete over layment over the <br /> Supreme (92) tank and expose the complete tank top. The product line will be <br /> drained and the turbine pump removed prior to rinsing the tank. <br /> The tank will be pumped free of product by ARCO Products Co. Scott Co. will <br /> subcontract ECI Inc of Stockton to pump and rinse the tank the morning of the <br /> tank entry. <br /> It will be the responsibility of Containment Solutions to de-gas the tank and <br /> cut a 24"x24" hole for entry. Containment Solutions will follow strict confined <br /> space entry permit procedures while performing the tank entry. The tank <br /> preparation and entry procedures will be overseen by Scott Co. and a Certified <br /> Industrial Hygienist, as required by SJCEH. <br />
The URL can be used to link to this page
Your browser does not support the video tag.