My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 Testing Options <br /> All LLD-300 Monitor supports 3.0 GPH testing and can be configured to additionally <br /> support 0.2 GPH and 0.1 GPH testing. <br /> * 3.0 GPH only - LLD-300* will perform continuous hourly testing after <br /> each dispense cycle, making it ideal for sites with mechanical leak <br /> detectors and/or double wall piping. <br /> * 0.2 GPH - (Optional) LLD-300* can automatically perform hourly and <br /> monthly tests after each dispense cycle and log the last 12 successful <br /> tests. <br /> * 0.1 GPH - (Optional) LLD-300* can perform hourly, monthly, and line <br /> tightness testing on demand and log the last 12 successful tests, both <br /> monthly and precision tests. <br /> Federal Regulations require that pressurized piping systems perform hourly 3.0 <br /> GPH line tests, and either a monthly 0.2 GPH or an annual 0.1 GPH line tightness <br /> test. Local regulations may vary. <br /> WPLLD sensors required <br /> 4.0 Supported Submersible Pumps and Piping <br /> 4.1 LLD-300 monitoring units SUDDort the following pumpg: <br /> Bed Jacket - SIP Bed Jacket - X Series <br /> P33R1 X3P150 <br /> P75S1 X5P150 <br /> P150SI <br /> FE Petro <br /> STPR33 STP33* <br /> STPP75 STP75* <br /> STPR150 STP150* <br /> STPHR150 STPH150* <br /> * Need precision Check Valve (FE Petro P/N 400153925). <br /> Note: Variable Speed Pumps are not currently supported by WPLLD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.