My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING & RESPONSE PLAN <br /> ARCO PRODUCT C PANY FACILITY WITH <br /> SINGLE WALL TANKS AND SINGLE WALL LINES <br /> STATISTICAL INVENTORY RECONCILIATION <br /> .0MAN <br /> ARCO Facility 2133 Address IRD 00 N\0\+ <br /> S'Cat�lto+.r CA, . 4S'La1 <br /> 1 . DETECTION METHOD <br /> Tanks - Statistical Inventory Reconciliation (SIR) and Biennial Tank Integrity Testing in <br /> accordance with SWRCB LG-123-1 and Section 2643 (c)(1), Article 4, <br /> Title 23, CCR. <br /> lanes - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br /> accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br /> 2 . MONITORING EQUIPMENT <br /> The Automatic line leak detectors shall be maintained and inspected according to the <br /> manufacturer's instructions by an outside contractor once during each calendar year. <br /> 3 . MONITORING PROCEDURE - Statistical Inventory Reconciliation <br /> Inventory reconciliation shall be performed in compliance with the details of SWRCB <br /> LG-123-1 . <br /> Q Inventory volume measurements for product inputs, withdrawals, and the amount <br /> remaining in the tank shall be recorded daily. <br /> B. The equipment used to take inventory readings shall be in good working order and <br /> capable of measuring the product level over the full range of the tank's height to the <br /> nearest one-eighth of an inch. <br /> C. Product inputs shall be reconciled with delivery receipts by measurement of the tank <br /> inventory volume before and after delivery. <br /> D. Deliveries shall be made through a drop tube that extends to within six inches of the <br /> tank bottom. <br /> E Meters used for determining inputs and withdrawals shall comply with CCR, Title 4, <br /> Chapter 9, Subchapter 1, "Tolerances and specifications for commercial weighing and <br /> measuring devices." Meters shall be inspected by the County Department of Weights <br /> and Measures or a device repairman as defined in the California Business and <br /> Professions Code, Division 5, Chapter 5.5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.