My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) follow all operating procedures specified by ARCO; <br /> (f) immediately report to ARCO all suspected or confirmed releases from the tanks and <br /> connected piping system, unusual operating conditions, release detection signals and environmental <br /> conditions suggesting a release may have occurred, and any spills and overfills that are not contained <br /> and cleaned up; <br /> (g) properly close the underground tanks as required by law; and, <br /> (h) comply with all federal, state and local legal requirements relevant to the operations <br /> of the underground tanks and all amendments to any permit to operate. <br /> 4. With respect to the operation of the underground storage tank system and monitoring equipment, <br /> Franchisee hereby acknowledges and agrees: <br /> - that ARCO has provided Franchisee with training on each of the items described in the attached <br /> Monitoring and Response Plan, <br /> - that Franchisee understood the content of the training, and asked any questions necessary to <br /> facilitate his understanding, <br /> - that Franchisee indicated to ARCO at the time of training any subjects addressed by the <br /> training which Franchsee did not fully understand, and <br /> - that Franchisee received complete training and information necessary for Franchisee to fully <br /> understand the subject of operating underground storage tanks. <br /> 5. ARCO has provided Franchisee a copy of and Franchisee agrees to maintain on the Premises the <br /> Certificate of Financial Responsibility (as required by the United States Environmental Protection <br /> Agency in Subpart H, 40 CFR, Part 280 and California Health and Safety Code, Chapter 6.7, <br /> Section 25292.2). <br /> 6. Except to the extent they conflict with, or are less rigorous than the terms of this Amendment, <br /> all of the terms and conditions of the PMPA Agreement, as previously or hereafter amended or <br /> supplemented, remain in full force. <br /> IN WITNESS WHEREOF, ARCO and Franchisee have executed this Amendment. <br /> ARCO Products Company <br /> a division of Atlantic Richfield Company <br /> ARCO <br /> WITNESS: <br /> 12 <br /> �• /1 JX By. <br /> Manager <br /> WITNESS PETER JACOWAY <br /> Franchisee's Name <br /> By: <br /> PETER JACOW <br /> DATE: Z g <br /> CA <br /> (1/92) 2 of 2 <br /> PARSBW <br />
The URL can be used to link to this page
Your browser does not support the video tag.