My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/16/1999 10:04 7146705420 EHS ARCO LA PALMA PAGE 010 <br /> MQNITqFd P <br /> NY r' <br /> NTL= <br /> ARCO Facility.- -LN-brb Address., <br /> 6 -� <br /> zrfo Y (5 <br /> This is a Monitoring and re§Wnge plan of action for facilities with spill <br /> containment device4 installed beneath the dispensers. <br /> 1. 9—OUT-AIMME <br /> Dispenser spill containment devices [box(es)] are located beneath <br /> each diisponser to contain any looks from components and fittings <br /> inside the di'spenser cabinet. A mechanical senSOf is located in the <br /> box. When the sensor detects the presence of a liquid, it will activate <br /> the impact valve and shut the dispenser down. <br /> 2. <br /> The containment devices will be inspected according to the <br /> manufacturer"s,instit uctions by an outside.contractor once during each <br /> calendar year. <br /> ® <br /> RQjaWKNQfiEQRINQ P N&KDURE <br /> _j <br /> On a weekly basis the Udlity operator shall: <br /> A. Inspect each containment box for the presence of a liquid. <br /> B. Remove debris from the containment box. <br /> If any liquid is fd, manually close " impact valve, place the <br /> dispenser "out of s6rvice", and call ARCO Maintenance immediately. <br /> 4. RESP <br /> OPERATOR RESPONSIBILITIES <br /> In the evignt.the impact valve is activated and shuts down a <br /> dispenser, station personnel immediately: <br />
The URL can be used to link to this page
Your browser does not support the video tag.