Laserfiche WebLink
03/1611999 10:04 7146705420 EHS ARCO LA PALMA PAGE OW <br /> A. contaut ARCO Maintenance or its designated agent by using <br /> ided- <br /> the telephone number pril <br /> evousy prov <br /> B. Tltg the dispenser "out of order" tilt liquid has been <br /> removed by authorized persons. <br /> ARCO RESPONSIBILMES <br /> Method of removing an unauthorized release from the spill <br /> containment device., <br /> A. Any unauthorlied release into the containment box will be <br /> removed by ARCO in accordance with California Health and <br /> Safety Code requirements. In the event of an emergency, a <br /> pumping contractor or truck will be available immediately. In <br /> all other cases, equipment availability will be within 12 hours. <br /> B. ARCO Maintenance will be responsible for authorizing and <br /> selardfing contractors for the workto he-performed. <br /> TRAINING <br /> All employees rn'ust be trained In the subject mentioned in Sections 3 <br /> and 4 above. Training needed for the operation of the dispenser <br /> conthinment devices $hall incitide how to Inspect the equipment and <br /> to manually close the dispenser impact valve. <br /> CA"D=00C 6M4 <br />