My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Page._s—of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer N Industry Standard Q Professional Engineer, <br /> 0 Other(Specify) <br /> I <br /> Test Method Used: ®Pressure p Vacuum p Hydrostatic <br /> FEI <br /> El Other(Specify) <br /> TAstEquipmpgt Used: DIAL GAUGE Equipment Resolution:0 to 15"psi <br /> MOO <br /> Piping Runt#!rZ 4 Piping Run# Piping Run Piping Ram#17 � <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> t <br /> Piping Manufacturer: <br /> Piping Diameter: _ 3. 5 3.1 <br /> Length of Piping Run: ��` ZpIF <br /> Product Stored: - 6-4 7 <br /> Method and location of I <br /> i mg-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes i 5 Minutes <br /> starting test: <br /> Test Start Time: me--16. <br /> Initial Reading.(RD: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: /!.' e<.T-- /-, //`/6 <br /> Final Reading(RF): $ PSi PSI PSI PSI <br /> Test Duration: _ 1 Hour 1 Hour 1 Hour 1 Hour i <br /> l <br /> Change in Reading(Ra-RD: PSI PSI PSI PSI I <br /> Pass/.Fail Threshold or Zero Zero Zero Zero <br /> Criteria: _ x <br /> Com` — ���.:w�.` �'R,.,i? rF- ds i,t Y`• a. a'835 - f <br /> a i[1l <br /> i <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) _ I <br /> "Lq i91,8 <br /> 13 <br /> I <br /> - T <br /> r - <br /> 1f <br /> 1 <br /> 1 <br /> BP#02133 ` <br /> f � <br /> 2908 W Benjamin Holt Di t <br /> Stockton,Ca j <br /> 08103 S13989 i F <br />
The URL can be used to link to this page
Your browser does not support the video tag.