My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Page <br /> _ 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer• 0 Industry Standard®.� ❑Professional Engineer, <br /> ®Other(Specify) <br /> i <br /> Test Method Used: ®Pressure 0 Vacuum ❑Hydrostatic <br /> i <br /> I]Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"psi ?- <br /> f <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass i <br /> Piping Manufacturer: <br /> Piping Diameter: _ <br /> Length of Piping Run: a <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: _— <br /> Wait time between applying <br /> pressurelvacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes ! <br /> starting test: — <br /> Test Start Time: <br /> Initial Reading(RD: _ 5 PSI — 5 PSI 5 PSI 5 PSI <br /> Test End Time: :30 <br /> Final Reading(RF): S- PSI PSI PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): $0 PSI PSI PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero Zero y <br /> Ctiteria: <br /> 1 <br /> CominentS—(include information on repairs made prior to testing,and recommended follow-up for failed tests) i <br /> 1 <br /> 5 <br /> i <br /> --BP#02133 — <br /> :2.908 W Benjamin Holt Dr <br /> ( <br /> Stockton,Ca <br />
The URL can be used to link to this page
Your browser does not support the video tag.