Laserfiche WebLink
04/15/2008 TUE 14:25 FAX 20946 83433 SJC EHD 2001 <br /> FAX TX REPORT <br /> TRANSMISSION OK <br /> JOB NO. 1227 <br /> DESTINATION ADDRESS 914252518782 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID <br /> ST. TIME 04/15 14:23 <br /> USAGE T 01' 07 <br /> PGS. 6 <br /> RESULT OK <br /> San Joaquin County DIRECTOR <br /> Donna Heran,REHS <br /> C, Environmental Health Department <br /> ASSISTANT DIRECTOR <br /> ast ain treat Laurie Cotulla,REHS <br /> 600 EMS <br /> Stockton, California 95202-3029 <br /> PROGRAM COORDINATORS <br /> • Carl Borgman,REHS <br /> Mike Huggins,REHS,RDI <br /> Cq'6 w Website:www.sjgov.org1ehd Margaret Lagorio,REHS <br /> Phone: (209)4683420 Robert McClellon,REHS <br /> Fax: (209)464-0138 Jeff Carruesco,REHS,RDI <br /> Kasey Foley,REHS <br /> April 10,2008 <br /> M.Alexia Ingues,Project Planner Sent via Fax and Mail <br /> Barghausen Consulting Engineers <br /> 18215 72"d Avenue South <br /> Kent,WA 98032 <br /> Fax: (425)251-8782 <br /> Subject: ARCO#2133,2908 Benjamin Holt Drive,Stockton,CA 95207(SR0053650) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for permit to perform an EVR phase Il upgrade and cold start. The permit has <br /> been approved with the following conditions. <br /> Conditions of approval: <br /> 1. Contact the local fire department, local planning or building department and the San <br /> Joaquin Valley Air Pollution Control District for any applicable permits. <br /> 2. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD)for approval prior to commencing work.All new addenda supercede <br /> the previous ones. <br /> 3. Before the alarm history is cleared by the"cold start",a current printout must be <br /> created and available for EHD inspection. Inspection may occur during the <br /> functionality test. <br /> 4. Contact Garrett Backus(209-468-2986)to arrange the following inspection(s)(a 48-hour <br /> notice is required): <br /> a. The EHD must witness the testing of the functionality of the monitoring system <br /> to ensure that monitoring has been restored to meet the requirements of <br /> California Code of Regulations Title 23 and the Health&Safety Code. <br /> 5. If concrete is being broken near the UST,pipeline and tank integrity testing must be <br /> performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br /> D--.,If,--+I- U.,+I-VL]rT-% <br />