Laserfiche WebLink
SWRCB,January 2002 ;Page_1_of_2 <br /> Secondary Containment Testing Report For <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local rejulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: ARCO#02133 Date of Testing: 9?J2019 <br /> Facility Address: 2908 BENJAMIN HOLT DRIVE,STOCKTON, CA 95207 <br /> Facility Contact: RICH GOSSETT Phone: (714)670-3958 <br /> Date Local Agency Was Notified of Testing: 81212011 <br /> Name of Local Agency Inspector(cf present during testing): NONE PRESENT <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: TANK TEK ENVIRONMENTAL CORP. <br /> Technician Conducting Test: RICHARD THOMAS <br /> Credentials: ®CSLB Licensed Contractor ®SWRCB Licensed Tank Tester <br /> License Type: A (CSLB Lic) License Number: 803705(CSLB Lic.)'-- 06-16721(SWRCB Lie) <br /> Manufacturer Training <br /> Manufacturer Com nent(s) Date Trainin Expires <br /> ICC CA UST SERVICE TECHNICIAN#5254736-UT DEC 28,2012 <br /> SC RCB TANK TESTER LICENSE#06-1672 JUN 30,,2012 <br /> FRANKLIN FUELING INCON SUMP TESTER#15012133701 FEB 8,2013 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component pass Feil Not,TRairs <br /> epTested Made TestedMade <br /> LTC SUMP ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ s <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑' ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ El El 1:1El El El El 11 0 El El <br /> El 13 ❑ F1v. Cl ❑ El F1El ❑ ' ❑ El ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ D ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,thefacts stated in thisidocument are accurate and in full compliance with legal requirements <br /> Date 91212011 <br /> Technician's Signature: <br />