Laserfiche WebLink
• 0 <br /> Facility Name: Arco #2133 (Page 3) <br /> In-Tank Gauging: <br /> ®Check this box if tank gauging is used only for inventory control and disregard following section. <br /> Complete the fol owing checklist: <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> E]Yes ❑No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> F1 Yes ❑No* Was accuracy of system product level readings tested? <br /> El Yes ❑No* Was accuracy of system water level readings tested? <br /> El Yes ❑No* Were all probes reinstalled properly? <br /> LJ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> ®Yes ❑No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑N/A performance? (Check all that apply) Simulated leak rate: ® 3 gph.; ❑ 0.1 gph ; ❑ 0.2 <br /> h. <br /> ®Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ®Yes ❑No* Was the testing apparatus properly calibrated? <br /> ®Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑N/A is disabled or disconnected? <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑N/A I malfunctions or fails a test? <br /> ®Yes ❑No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />