Laserfiche WebLink
Op`QUIk• C <br />?•'�' •o SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />y.. ` 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />a�fPOR� <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />f2 - c-,> •7l 33 <br />❑ <br />F cilityyAddress: <br />Service Request #: <br />7,_9�� Pj`'''1 /� i:�, <br />�a0---> .5 <br />Onsite Service Technician's Name: <br />ICC Se ice Technician/installer Exp. Date: <br />Manufacturer Training: <br />01 e-� <br />❑ mechanical Model: <br />SERVICE <br />C4, — o w- <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />Z4 <br />❑ electronic Serial #: <br />4 Imo- '✓' L I <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />TAC <br />❑ fail safe Serial #: <br />ME AT EHD'S CURRENT HOURLY RATE. <br />❑ NA <br />15< <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />rEl <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LIS letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />C4, — o w- <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Z4 <br />❑ Caldwell System ❑ Other <br />4 Imo- '✓' L I <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />TAC <br />UDC(s) Piping <br />ME AT EHD'S CURRENT HOURLY RATE. <br />Dj.�--Sump(s) UST(s) <br />15< <br />Testing for the above components are next due by: <br />Title: <br />Note: Please be aware that 21 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />rEl <br />Other: see below <br />.,a This UST facility is NOT APPROVED to operate <br />EHID f 4 <br />Rev 0/06/ <br />UST SERVICE REQUEST INSPECTION REPORT <br />C4, — o w- <br />�dL�^ -' r h <br />. <br />ci e P S <br />Z4 <br />11 <br />h- <br />4 Imo- '✓' L I <br />be <br />TAC <br />ITY_ IS SUBJECT TO REINSPECTION AT ANY <br />ME AT EHD'S CURRENT HOURLY RATE. <br />EHD 1pspe <br />7e)ived By: <br />Title: <br />EHID f 4 <br />Rev 0/06/ <br />UST SERVICE REQUEST INSPECTION REPORT <br />