Laserfiche WebLink
oQco.!?ly• c <br />?'' o SAN JOAQUIN COUNTY <br />2:. tri-_- . •G <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />.'c . `P•. Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sj og vora/ehd <br />R�1FOR� <br />Facil me: <br />- C () 9A se; <br />Leak detector <br />Inspection Date: <br />Facil' Address- <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Service Request #: <br />❑ Caldwell System ❑ Other <br />❑ line test programmed <br />Spill bucket ❑ minimum 5 gallon <br />Onsite Se 'ce Technic•an s Name: <br />❑ <br />ICC Seryce Technician Installer Exp. Date: <br />Manufacturer Training: <br />❑ electronic Serial #: <br />Primary piping testing at: <br />� 4 Lj; Is :i IS/12,11S <br />RIA&do J - ` 8 � <br />SERVICE <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ electronic Serial #: <br />❑ Caldwell System ❑ Other <br />❑ line test programmed <br />Spill bucket ❑ minimum 5 gallon <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ Caldwell System ❑ Other <br />❑ electronic Serial #: <br />Primary piping testing at: <br />❑ line test programmed <br />psi <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />Secondary containment testing for: <br />❑ fail safe Serial #: <br />UDC(s) Piping <br />ump(s) UST(s) <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />j dr �1 <br />❑ fail safe Serial #: <br />Note: Pleale be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ NA <br />Cold start of monitoring panel <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />Other: see below <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />SERVICE <br />f i , <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />f <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />_ <br />- - -PM <br />red <br />UDC(s) Piping <br />ump(s) UST(s) <br />1111 <br />T tin for to a ve com onents are next due by: <br />j dr �1 <br />Note: Pleale be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />This UST facility is NOT APPROVED to operate <br />>r + <br />f i , <br />r <br />f <br />_ <br />- - -PM <br />red <br />1111 <br />EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br />Rev 10/06/10 <br />