My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br />I --o <br />STAR - SMITH FIBERCAST <br />NOTE: Fiberglass alignment rings can <br />only be bonded to a flat fiberglass sur- <br />face. DO NOT install on round or ther- <br />moplastic sumps. <br />1. Determine entry hole location and <br />cut entry hole in sump wall using di- <br />mensions in Table 1. (Maximum allow- <br />able offset is 50 - shown in "Adhesive <br />Bead" drawing below.) <br />TABLE 1 - Fitting Dimensions <br />Size <br />A <br />B <br />C <br />In. <br />In. <br />In. <br />In. <br />2" <br />6 <br />3 <br />29/16 <br />3" <br />6 <br />3 <br />33/4 <br />4" <br />6 <br />3 <br />33/4 <br />J <br />Bulletin No. B2107 <br />January 1, 2007 <br />• r • r <br />2. Using 40-60 grit sanding surface, <br />sand the area around the hole where <br />the alignment rings will bond to the <br />sump. Lightly sand the rings. Remove <br />dust and wipe with solvent (optional). <br />3. Place two alignment rings on sump <br />entry/termination fitting and insert <br />through sump wall with the rings on the <br />outside of the wall. <br />4. Dry fit pipe and rotate the two rings <br />until the desired angle is reached. <br />Make alignment marks on the rings, the <br />fitting, and the sump wall. Be sure to <br />mark the rings so they can be placed in <br />the same location and sequence during <br />bonding. <br />Entry/Termination Fitting Body <br />Sump Well <br />Alignment Rings <br />Outside Sump Inside Sump <br />---— C <br />HOLE DIA <br />B <br />A <br />® Trademark of Varco I/P, Inc. FIBER GLASS SYSTEMS • A NATIONAL OILWELL VARCO COMPANY <br />http://www.smithfibercast.com 2700 W. 65th ST., LITTLE ROCK, AR 72209. 501-568-4010 - FAX 501-568-4465 <br />25 S. MAIN ST, SAND SPRINGS, OK 74063 -918-245-6651 - FAX 918-245-7566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.