My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Single -Wall • Ent*Termination+ <br />5. Place one ring over the sump fitting <br />in the inside of the sump and rotate to <br />the desired angle. Make alignment <br />mark on both the sump wall and the <br />ring. <br />6. Mix one 7014 or 8014 adhesive kit <br />for each fitting per the instructions in <br />the adhesive kit. Mix in filler to thicken <br />adhesive (fiberglass alignment ring <br />will not seal properly without filler). <br />7. Apply adhesive generously, appro- <br />ximately Vie thick to the inside and <br />the outside of the sump walls where <br />the alignment rings are located. Coat <br />cut edges of the entry hole. Apply a <br />thin coating of adhesive to all three <br />alignment rings. <br />8. Line up rings with alignment marks <br />and press together firmly. <br />9. Slide the metal retaining ring over <br />inside section of sump fitting against the <br />alignment ring until tight against sump <br />wall. A short section of pipe (3" pipe for <br />2" fitting, 4" pipe for 3" fitting; contact <br />manufacturer for 4" fitting) may be used <br />to drive the metal retaining ring over the <br />fitting. Be sure there is an adhesive <br />bead visible between the rings and <br />the sump wall. The metal ring must <br />hold the assembly in position while the <br />adhesive cures. If the assembly is not <br />tight against the sump wall, firmly press <br />the entry fitting against the outside <br />sump wall while pressing the metal <br />ring against the alignment ring on the <br />inside. <br />10. Do not disturb assembly until <br />the adhesive is cured. Clean excess <br />adhesive from all bonding surfaces. <br />See adhesive kit instructions for cure <br />times. <br />11. The use of an industrial hot air gun <br />may speed up the curing process. Do <br />not overheat. <br />EDILE ROCK, AR <br />SAtiC7 SPRINGS, OK: <br />MEMBER <br />aff <br />NTf <br />v i racerriarK or varco 11P, Inc. FIBER GLASS SYSTEMS - A NATIONAL OILWELL VARCO COMPANY <br />www.smithfibercast.com 2700 W. 65th ST., LITTLE ROCK, AR 72209 -501-568-4010 - FAX 501-568-4465 <br />Printed USA 2.5M1206 25 S. MAIN ST., SAND SPRINGS, OK 74063 -918-245-6651 - FAX 918-245-7566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.