Laserfiche WebLink
The local agency should also be Present during installation to verify that the <br />automatic condensate removal system is installed and that it perfdrms correctly <br />The r rrectl <br />ystem should be checked annually during the annual maintenance <br />certification, If the system ceases to function as designed, the tank owner or <br />operator should check the vapor pot daily to remove any standing product until the <br />system can be repaired or replaced. Any repair or replacement work must be <br />approved by the local agency before it is performed. If a release occurs m. fro <br />eer or operator must follow the requirements of Article 5 <br />vapor pot, the tank own a <br />CCR. <br />If you have any questions, contact John Welch at 916-227.4323 or me at 916.227. <br />4332. <br />Sincerely, <br />ave Ho <br />4 er <br />Engineering Unit <br />Underground Storage <br />c-\wpdaU\meM0S\vaPrlttr, doe <br />TOTRL P.02 <br />