Laserfiche WebLink
°Qqu1� c SAN-JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />N l { 600 East 'Main Street, Stockton, CA 95202-3029 <br />�q \� Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.orglehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />y <br />:Facility Name: <br />SERVICE <br />Inspection Date.. <br />Leak detector <br />❑ 1 hour hydrostatic F1Incon TS -STS <br />® <br />li A <br />Model: <br />f` Spill bucket finimum 5 gallon <br />Facility Address: <br />Serial #: <br />Service Request #: <br />❑ line test programmed <br />p <br />Leak detector <br />Onsite Service Tec nlclan s Name. <br />❑ <br />IGC Service Technician/installer Exp. Date: <br />Manufacturer Tr inIng: q <br />❑ electronic <br />Serial #: <br />UDC(s) Piping <br />This UST facility is APPROVED to operate <br />r ire=.+• , � S� -a.' vr^._ tom; <br />SERVICE <br />SERVICE <br />Spill bucket ❑minimum 5 gallon <br />Leak detector <br />❑ 1 hour hydrostatic F1Incon TS -STS <br />® <br />© mechanical <br />Model: <br />f` Spill bucket finimum 5 gallon <br />❑ electronic <br />Serial #: <br />❑ line test programmed <br />Leak detector <br />Elpsi <br />❑ <br />❑ mechanical <br />Model: <br />❑ electronic <br />Serial #: <br />UDC(s) Piping <br />❑ line test programmed <br />Sump(s) UST(s) <br />sensor <br />for the above components are next due by: <br />❑ <br />❑ positive shutdown <br />Model: <br />installation, 6 months after, and every .:36 months thereafter::. <br />❑ fail safe <br />Serial #: <br />171Corrosion <br />❑ NA <br />ElOther: <br />see below <br />sensor <br />❑ <br />❑ positive shutdown <br />Model: <br />fail safe <br />Serial #: <br />❑ NA <br />-sensor <br />❑ <br />❑ positive shutdown <br />Model: <br />❑ fail safe <br />Serial#: <br />❑ NA <br />❑ <br />Drop tube with <br />mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />r ire=.+• , � S� -a.' vr^._ tom; <br />SERVICE <br />I-J�,A- i <br />Spill bucket ❑minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic F1Incon TS -STS <br />❑ Caldwell System ❑ Other <br />f` Spill bucket finimum 5 gallon <br />:8� 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />Elpsi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />F1Testing <br />for the above components are next due by: <br />Note: Please be aware that 21 containment components are required tobetested upon-- <br />installation, 6 months after, and every .:36 months thereafter::. <br />❑ <br />Cold start of monitoring panel <br />171Corrosion <br />protection <br />ElOther: <br />see below <br />ElThis UST facility is NOT APPROVED to operate <br />I-J�,A- i <br />EHD 23-o4 <br />Rev 10(IWI0 <br />)�y;"-z ; '� Title: - <br />-^ UST SERVICE REQUEST INSPECTION REPORT <br />I-J�,A- i <br />i <br />- .a.,«.. ^✓_.:,;;�, �,,�$_„.� , ,moi"� -� �.� <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD }nspe <br />; <br />Received <br />EHD 23-o4 <br />Rev 10(IWI0 <br />)�y;"-z ; '� Title: - <br />-^ UST SERVICE REQUEST INSPECTION REPORT <br />