Laserfiche WebLink
11 <br />E <br />WRITTEN MONITORING AND RESPONSE PLAN <br />Ur41ERGROUND STORAGE TANK MONITORLNG PROGRAM <br />This monitoring program must be kept at the TJST location at all times. The information on this monitoring program are <br />conditions of thi operating permit. The permit holder must notify Envitonmental Health Department, (209) 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a permit before nuking <br />tW e change. Required by CCR 2632 (d) and 2641 (h). <br />DA:B� • Z <br />FACILITY NAME covh�jtyv�jv& FFna-D FV <br />C <br />FACILITY ADDRESS a 7 0 <br />I.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />u> <br />2.Describe the frequency of performing the monitoring for. <br />PIPING <br />TANKS — & "--V <br />3.Describe the location(s) of where. the monitoring will be pefformed. ie: location ofsensors <br />4.Describe thefollowing equipmentfor each underground.storage lank <br />Name and Model of Monitoring Panel —CLM4-j—r--1 <br />Name and Model of Line Leak Detectors le <br />Name and Model of Annular Sensors <br />Name and Model of Piping Sensors <br />Name and Model of Dispenser Sensors <br />tz� <br />Type of overfill prevention <br />S.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes)!§� No 11 <br />k <br />Does the turbine shut down if a sensor is disconnected? Yet No 0 <br />NO 0 <br />Does the turbine shut down is the monitoring panel loses power? ye - <br />Mail <br />monitoring equipment must be performed at least once every 12 months. <br />7.Maintenmce of the . aj�nt. t month wil) <br />Describe the preventive maintenance schedule and recording for the monitoring EQUIP <br />annual monitoring certification be performed <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary containment sYstems <br />must be tested once every 3 6 months with al jestingperformed before January 1, 2003. <br />8. Describe the tzining necessary for the operation of UST systeria, including piping, and the monitoring <br />a W N i m' <br />55012W2 <br />