Laserfiche WebLink
t 1' f ( `n tuff indicated must elSIDSO beforetesting-Mtemperatemsw <br /> 65°F(186%use an ftlemal hew source to force cure the e.The <br /> adhesive should be wamw4 to 70°F(21 OC)before mbdng and applying. <br /> an Ameron Chem Cure Pak,hot aur gun.an <br /> Ameron Nkiling blanket will COMPIMIYcontainment fitting,or a <br /> forced air heater if the trench is covered to contain the heat At temperatures <br /> below 40°F(4°C)or if it is windy,plug the and of the pipe before curing old.if. <br /> 'ng heaft bbankets,wrap insulation ow the heating blanket and fittings. <br /> Sealing Afterthe primary lineshave sdfully ,the containment <br /> system' <br /> •� can be joined.Forthe to mt Prop",all bonding must <br /> be ftee from water.soap,oil,grease,dirt and the like and should be lightly <br /> sandW.Take care that each leg of the containment pipe goes into <br /> straight and is not disturbed until the adhesive has cured•Do rick sW on <br /> the <br /> conft&vuerd pipe before Ihe adhesive is cumd as this can cfistffb On <br /> jakits enough to cause leaks. <br /> Assembly of v-and Apply a urdfcwm,heaW coabng of adhesive to allsealing <br /> surfaces <br /> 4•,•nch systems of the grtting,to the sanded radius of the fitting where the pipe will fit and to the <br /> outside of the containment pipe.Put the contahmentlitting around the <br /> containment pipeily.Make sure it is riot cooked ormisaligned in the <br /> Tag the nuts and bolts in to mating surfaces together <br /> evenly.Bring the nubs and bolts on the inside Vanges of the elbows and tees <br /> .- <br /> down first 'ng those on the outside completer Do not attempt to <br /> move the containment piping during the cure as this May cause leaks. <br /> s� <br /> Assembly <br /> of ire s Apply a uniform layer of SC-10 adhesive at least'ra inch thick to all <br /> flat.sanded <br /> sealing surfaces,the sanded end of the containnuint pipe and to the <br /> swided <br /> radius of the frtting where the containrrwft pipe will fit Assembly procedures <br /> after application of SC-10 adhesive are the same as for C20HT. <br /> If thetemperature is below 40°F(40C),the containment pipe and containment <br /> fittings should be warmed to at least 70®F(21°C)before applying the warmed <br /> adhesive. <br /> Number of ngs that can be joined 6adhesive kit <br /> TypeAdhesive W Concentric <br /> Elbows ®4bows 5 Tees RsdLgms saddmCouplings <br /> CZ <br /> 3-in 4 d 3 5 10 4 <br /> 4-in 4 4 3 5 10 3 <br /> SC-10 <br /> 6-in 1 1 1 1 1 1 <br /> 6 <br /> 80 'd WEA Zt:t t NOW 96-x91-AON <br />