My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provisions r testing TheIocafion and number of probes will determine whetherto use open end <br /> C9 "t1 terminationsin hole "ons,reducer is threadedin <br /> releaw chole extensions.or"Utraps. <br /> Open end termkisitioris:In some jurisdictions it may be admissible to Sown the <br /> containment to drain d into the turbine pump enclosure. <br /> sow <br /> Reducer sheft with ftead0d IDUI Where open end terminations are not <br /> admissible,the containment can be closed off by means of a reducer with <br /> fteaded outlet.Release detection equipment can be attached at the threaded <br /> outlet.The gloss should be removed at the bonding areas on the primary and <br /> secondary pipes surface. <br /> S-0 <br /> (bra��I <br /> `ty tW=pressure test equipment can be connected to the t piping <br /> CC, tocmed at a M by ®apq{ of{a threadedyy� adapter or <br /> �o $ tiaps am VPI <br /> ®q <br /> t to h ,at o at in Oka <br /> ffmitor possible releases from VV Primary and are fabricated by mounting a <br /> reducing saddle on the underside of the containment pipe,the trap beff is <br /> efrvm two W elbows,two short nipples and a riser which turrinates in a <br /> manhole'U"trap pilling should be bonded together with C20HT adhesive <br /> following ordinaty primacy pipe bonding procedum <br /> i <br /> sea <br /> rov ( <br /> I <br /> 60 'd WV £b:11 NOW 86-9I-AON <br />
The URL can be used to link to this page
Your browser does not support the video tag.