Laserfiche WebLink
SWRCB,Janlxary 2002 Page 2 <br /> 9. *L/OVERFILL CONTAINMENT hWES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑Industry Standard X❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: F] Pressure F1 Vacuum F] Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 UNL FILL Spill Box# 1 UNL VAPOR SpillBox# 2 PRE FILL Spill Box# 2 PRE VAPOR <br /> Bucket Diameter: 12 12 12 12 <br /> Bucket Depth: 16 13 16 13 <br /> Wait time between applying <br /> pressure/vacuur /water and 1 MIN 1 MIN 1 MIN 1 MIN <br /> starting test: <br /> Test Start Time: 12 :21 12 :24 12:2 8 12:4 6 <br /> Initial Reading(RI ): 30 30 30 30 <br /> Test End Time: 12 :22 12 :2 5 12 :2 9 12 :47 <br /> Final Reading(RF ): 27 30 30 0 <br /> Test Duration: 1 MIN 1 MIN 1 MIN 1 MIN <br /> Change in Reading(R F-RI ) 3 0 0 30 <br /> Pass/Fail Threshold or 4" WC 411 WC 4" WC 4" WC <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 91 VAPOR AND DSL HAD LEAKS IN THE BELLOWS AREA OF THE BUCKET TOWARD THE BOTTOM. <br />