Laserfiche WebLink
SWRCB,January 2002 Page 3. <br /> 9. S L/OVERFILL CONTAINMENT AWES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El —1 <br /> Test Method Developed By: F] Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: ❑ Pressure Fx Vacuum ❑ Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 3 DIE FILL Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 12 <br /> Bucket Depth: 16 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 MIN <br /> starring test: <br /> Test Start Time: 12:37 <br /> Initial Reading(Ri ): 30 <br /> Test End Time: 12 :48 <br /> Final Reading(RF ): 0 <br /> Test Duration: 1 MIN <br /> Change in Reading(R F-14 } 30 <br /> Pass/Fail Threshold or 4 It WC <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 91 VAPOR AND DSL HAD LEAKS IN THE BELLOWS AREA OF THE BUCKET TOWARD THE BOTTOM. <br />