Laserfiche WebLink
SWRCB,January 2002 5. SECONDARY PIPE TESTING E C ELIeVE D <br /> Test Method Developed By: F, Piping Manufacturer W Industry Standard r Professional Engine r <br /> F Other(Specify) So jO 2014 <br /> Test Method Used By: 17F, Pressure r Vacuum r Hydrostatic <br /> F, Other(Specify) ENVIRONMENTAL HEALTH <br /> Test Equipment Used: gauge Equipment Resolution: .20 U!=,, saaml wtN <br /> (T isTI (Tam T3 I <br /> taxnmttt 1 to f2, I av coji eiat,-I to <br /> .......... <br /> Piping Material: dw fiberglass dw fiberglass dw fiberglass <br /> Piping Manufacturer: smith smith smith <br /> Piping Diameter: 3 in. 3 in. 3 in. in. <br /> Length of Piping Run: .200 ft. 200 ft. 200 ft. ft. <br /> Product Stored: RUL PUL Diesel <br /> Method and location of stp sump stp sump stp sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test: <br /> Test Start Time: 10:20:00 10:20:00 10:20:00 <br /> Initial Reading(RI): 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Test End Time: 11:20:00 11:20:00 11:20:00 <br /> Final Reading(RF): 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Test Duration: I hr I hr I hr <br /> Change in Reading(RF-Rt): 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/-0.00000 <br /> Criteria: <br /> Passass:-, ... <br /> PPast <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2319172 <br />