My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 5. SECONDARY PIPE TESTING E C ELIeVE D <br /> Test Method Developed By: F, Piping Manufacturer W Industry Standard r Professional Engine r <br /> F Other(Specify) So jO 2014 <br /> Test Method Used By: 17F, Pressure r Vacuum r Hydrostatic <br /> F, Other(Specify) ENVIRONMENTAL HEALTH <br /> Test Equipment Used: gauge Equipment Resolution: .20 U!=,, saaml wtN <br /> (T isTI (Tam T3 I <br /> taxnmttt 1 to f2, I av coji eiat,-I to <br /> .......... <br /> Piping Material: dw fiberglass dw fiberglass dw fiberglass <br /> Piping Manufacturer: smith smith smith <br /> Piping Diameter: 3 in. 3 in. 3 in. in. <br /> Length of Piping Run: .200 ft. 200 ft. 200 ft. ft. <br /> Product Stored: RUL PUL Diesel <br /> Method and location of stp sump stp sump stp sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test: <br /> Test Start Time: 10:20:00 10:20:00 10:20:00 <br /> Initial Reading(RI): 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Test End Time: 11:20:00 11:20:00 11:20:00 <br /> Final Reading(RF): 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Test Duration: I hr I hr I hr <br /> Change in Reading(RF-Rt): 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/-0.00000 <br /> Criteria: <br /> Passass:-, ... <br /> PPast <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2319172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.