My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R E <br /> SWRCB,January 2002 C age 1 lol <br /> 6.PIPING SUMP TESTING <br /> Test Method Developed By: Tank Manufacturer �O.' Industry Standard Professio n neer <br /> Other(Specify) <br /> Test Method Used By: r Pressure r— vacuum prEmwRQWmENTALU <br /> F` Other(Specify) DERACITMENT <br /> Test Equipment Used: VPLT Equipment Resolution: 0.00001 in. <br /> STP Containment for STP Containment for STP Containment for <br /> Tank TI:RUL-1 Tank T2:PUL-I Tank T3:Diesel- 1 <br /> Sump Diameter/Dimensions: 48 in. 48 in. 48 in, in. <br /> Sump Depth: 59.00 in. 59.00 in. 59.00 in. in. <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12.00 12.00 12.00 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 700 7.00 7.00 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: good good good <br /> Portion of Sump Tested' 14 14 14 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both r Yes r'" Nor NA G Yes r No r°` NA ro Yes r No r" NA f'" Yes r No r' NA <br /> product and water)?* <br /> Turbine shutdown response time 02:00:00 sec 02:00:00 sec 02:00:00 sec sec <br /> Is system programmed for fail-safe C« Yes r No tr' NA ro Yes f" Nor NA r Yes r No C NA t"' Yes No r NA <br /> shutdown?* <br /> Was fail-safe verified to be G Yes rr No IT NA ro Yes r Nor NA ro Yes T No C NA r" Yes C Not"' NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min min <br /> test <br /> Test Start Time: 10:23:00 10:45:00 10:45:00 <br /> Initial Reading(Rl): 0.00000 in. 0.00000 in. 0.00000 in. <br /> Test End Time: 11:53:00 11:15:00 11:15:00 <br /> Final Reading(RF): -0.00030 in. -0.00140 in. -0.00110 in. <br /> Test Duration: 30 min 30 min 30 min <br /> Change in Reading(RF-RI): 400030 in. -0.00140 in. -0.00110 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00200 +/-0.00200 +/-0.00200 <br /> 7777777777777777, <br /> lass Pass' <br /> Was sensor removed for testing? G Yes r Nor NA r Yes rr No r"' NA ro Yes r"' No r NA r Yes rr Not" NA <br /> Was sensor properly replaced and t^ Yes r No r NA rf Yes r" Nor NA r: Yes r No C NA r^ Yes r Nor NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. <br /> WO:2319172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.