My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3WRCB,January 2002 Page 1 of I <br /> 4.TANK ANNULAR TESTING <br /> Test Method Developed By: r Tank Manufacturer 06 Industry Standard r Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: t""'= Pressure GO Vacuum r Hydrostatic <br /> r, Other(Specify) <br /> Test Equipment Used: au a Equipment Resolution: <br /> Tat" Tank#.2 P1� eSt . Tai" <br /> Is Tank Exempt From Testing?' C Yes t►'No r Yes ro No �"'Yes CF No r Yes r No <br /> Tank Capacity: 10369 10369 <br /> Tank Material: Fiberglass Fiberglass Fiberglass <br /> Tank Manufacturer: xerxes xerxes xerxes <br /> Product Stored: RUL PUL Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min min <br /> test: <br /> Test Start Time: 12:14:00 12:02:00 12:09:00 <br /> Initial Reading(Rl): 10.00000 in.HG 10.00000 in.HG 10.00000 in.HG <br /> Test End Time: 13:14:00 13:02:00 13:09:00 <br /> Final Reading(RF): 9.00000 in.HG 9.00000 in.HG 10.00000 in. HG <br /> Test Duration: I hr I hr 1 hr <br /> Change in Reading(RF-RI): -1.00000 in.HG -1.00000 in.HG 0.00000 in.HG <br /> Pass/Fail Threshold or Criteria: +/-2.00000 +/-2.00000 +/-2.00000 +/ <br /> 'Fest-Risul# 'Ton Pass=> <br /> Was sensor removed for testing? rYes C No 1~ NA r. Yes t*' Nor NA r Yes r Nor NA r Yes r Nor NA <br /> Was sensor properly replaced and r Yes r Not . NA r Yes r Nor* NA r Yes r, No C NA r Yes r Nor NA <br /> verified functional after testing? <br /> Comments? include information on repairs madeprior to testing,and recommended ollow-u or ailed tests <br /> f <br /> a <br /> l Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as <br /> systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.