Laserfiche WebLink
1 1 <br /> SWRCB,January 2002 Page 1 of 1 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: P-0 Piping Manufacturer r Industry Standard Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: rv—� Pressure vacuum r Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: 0 <br /> (Tank Tl:-RUL)St (Tank T2:= )STP (rank T3:-Diesel) <br /> Containment'l.to l/2, Containment 1 to 1/2 STP Containment 1 to <br /> 3/4,5/6,7/8 3/4 5/6:7/8 5/6,7/8 <br /> Piping Material: dw frp dw frp dw frp <br /> Piping Manufacturer: smith smith smith <br /> Piping Diameter: 3 in. 3 in. 3 in. in. <br /> Length of Piping Run: 200 ft. 200 ft. 200 ft. ft. <br /> Product Stored: RUL PUL Diesel <br /> Method and location of <br /> sump sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test: <br /> Test Start Time: 09:30:00 09:30:00 09:30:00 <br /> Initial Reading(Rt): 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test End Time: 10:30:00 10:30:00 10:30:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/-0.00000 +/ <br /> Criteria: <br /> [—Test,"Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> h <br /> UG <br /> 08 l to <br /> .� .� -A <br /> WO:2314059 <br />