My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> SWRCB,January 2002 Page 1 of 1 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: P-0 Piping Manufacturer r Industry Standard Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: rv—� Pressure vacuum r Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: 0 <br /> (Tank Tl:-RUL)St (Tank T2:= )STP (rank T3:-Diesel) <br /> Containment'l.to l/2, Containment 1 to 1/2 STP Containment 1 to <br /> 3/4,5/6,7/8 3/4 5/6:7/8 5/6,7/8 <br /> Piping Material: dw frp dw frp dw frp <br /> Piping Manufacturer: smith smith smith <br /> Piping Diameter: 3 in. 3 in. 3 in. in. <br /> Length of Piping Run: 200 ft. 200 ft. 200 ft. ft. <br /> Product Stored: RUL PUL Diesel <br /> Method and location of <br /> sump sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test: <br /> Test Start Time: 09:30:00 09:30:00 09:30:00 <br /> Initial Reading(Rt): 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test End Time: 10:30:00 10:30:00 10:30:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/-0.00000 +/ <br /> Criteria: <br /> [—Test,"Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> h <br /> UG <br /> 08 l to <br /> .� .� -A <br /> WO:2314059 <br />
The URL can be used to link to this page
Your browser does not support the video tag.