Laserfiche WebLink
SWRCB,January 2002 Page I of 1 <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 1 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: W, Spill Bucket Manufacturer Industry Standard r Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: Pressure Vacuum W Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used:VPLT Equipment Resolution:0.00001 in. <br /> Spill Box#J Tank T 1, Spill x#Tank T ali Box#T'ank <br /> tee e)in Grady toxa I anpltt Box <br /> c4statnent sump' � t surtp contnniers surxtp <br /> Bucket Diameter: 12.00 121.00 12.00 <br /> Bucket Depth: 12.75 13.00 12.25 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> startina test <br /> Test Start Time: 10:50:00 10:50:00 10:50:00 <br /> Initial Reading(RI): 12.75 in.H2O 13.00 in.H2O 12.25 in.H2O <br /> Test End Time: 11:50:00 11:50:00 11:50:00 <br /> Final Reading(RF): 12.75 in.H2O 13.00 in.H2O 12.25 in.H2O <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0.00 in.H2O 0.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +/ <br /> astresult: Pass' Pass Pass' <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 41 <br /> 1 r <br /> d <br /> x# ,b <br /> Vqt ,i� irytl <br /> WO:2314059 <br />