My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page I of 1 <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 1 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: W, Spill Bucket Manufacturer Industry Standard r Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: Pressure Vacuum W Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used:VPLT Equipment Resolution:0.00001 in. <br /> Spill Box#J Tank T 1, Spill x#Tank T ali Box#T'ank <br /> tee e)in Grady toxa I anpltt Box <br /> c4statnent sump' � t surtp contnniers surxtp <br /> Bucket Diameter: 12.00 121.00 12.00 <br /> Bucket Depth: 12.75 13.00 12.25 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> startina test <br /> Test Start Time: 10:50:00 10:50:00 10:50:00 <br /> Initial Reading(RI): 12.75 in.H2O 13.00 in.H2O 12.25 in.H2O <br /> Test End Time: 11:50:00 11:50:00 11:50:00 <br /> Final Reading(RF): 12.75 in.H2O 13.00 in.H2O 12.25 in.H2O <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0.00 in.H2O 0.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +/ <br /> astresult: Pass' Pass Pass' <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 41 <br /> 1 r <br /> d <br /> x# ,b <br /> Vqt ,i� irytl <br /> WO:2314059 <br />
The URL can be used to link to this page
Your browser does not support the video tag.