Laserfiche WebLink
San Joa uin Count 0 <br />q Y <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />s•' <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />August 5, 2013 <br />Joe Nguyen <br />ASI Consulting <br />4307 Valley Ave #3 <br />Pleasanton, CA 94566 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />Re: 7 -Eleven, 3202 W Hammer Lane, Stockton, CA 95209 SR0067106 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to install fill sumps on existing tanks, liquid sensors in the under <br />dispenser containment and fill sumps, new spill containers and new mechanical overfill drop <br />tubes on the underground storage tank (UST) system at the above noted address. The permit <br />has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Garrett Backus at (209) 468-2986 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). . <br />a. Primary vent/vapor recovery piping test: One hour pneumatic pressure and soap <br />test. <br />b. Functionality of new liquid sensors: Functionality of the monitoring system must be <br />verified to ensure that monitoring has been restored to meet the requirements of Title <br />23 California Code of Regulations and the Health & Safety Code. If a cold start is <br />necessary, all sensors will be tested. Print an alarm history prior to the cold start and <br />provide a copy to the inspector. <br />c. Overfill prevention verification: Measurement of drop tubes to verify 95% tank volume <br />shut off. <br />d. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br />test (or equivalent). Proper drainage must also be verified. <br />e. After backfill, secondary containment testing on the new fill sumps, existing tanks <br />and existing product piping. <br />Please be aware that the facility cannot operate the UST system or drop fuel into <br />the tanks prior to the EHD inspection and approval. <br />