My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 -Eleven, 3202 W Hammer Lane, Stockton, CA 95209 SR0067106 <br />4. Secondary containment testing for the fill sumps is required six months after installation. <br />Provide 48 hours notification to the EHD when this test is scheduled. <br />5. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), or a <br />Tank Tester's license issued to the individual by the State Water Board, and <br />b. A valid, current California UST Service Technician certificate issued by the <br />International Code Council (ICC), and <br />c. A valid, current certificate of training from the manufacturer(s) of the component(s) <br />being tested, repaired, or serviced. <br />6. Qualified installers must possess or work under the direct and personal supervision of an <br />individual physically present at the work site who possesses all of the following: <br />a. A valid, current contractor's license issued by the Contractors State License Board, <br />and <br />b. A valid, current certificate of training from the manufacturer(s) of the component(s) <br />being installed, and <br />c. A valid, current UST Installation/Retrofitting certificate issued by the International <br />Code Council (ICC). <br />7. Log into the California Environmental Reporting System (CERS), update and submit the <br />"UST Monitoring Plan" for all the tanks. <br />8. Log into the California Environmental Reporting System (CERS), complete and submit a <br />"UST Certification of Installation/Modification" form for the new fill sumps. <br />9. All components must be certified by an independent testing organization and labeled as <br />required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br />Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br />10. Permit expires 180 days from the date of approval. If an extension to the expiration date <br />is required, a written request must be submitted to this office prior to the expiration date. <br />If you have any further questions, please contact me at (209) 468-2986. <br />Thank you, <br />/arrettckus, REHS <br />Senior Registered Environmental Health Specialist <br />K <br />
The URL can be used to link to this page
Your browser does not support the video tag.