Laserfiche WebLink
} Letitia Briggs <br />January 28, 1999 <br />Page 2 of 2 <br />Attached is an e-mail from OPW which states that the impact valves on the piping system <br />should not be pressurized beyond 75 psi for the one-hour test. As this is part of the piping <br />primary system it was included in the previously witnessed air/soap test and should not be <br />subject to higher pressures. <br />As the project has been delayed and the County is anxious for the fueling facility to reopen, <br />your approval of the air test on the primary piping system is awaited. Please call me to discuss <br />how this project may be allowed to continue, short of performing a test not required as part of <br />your plan approval. <br />Respectfully, <br />T D ASSOCIATES, INC. <br />Stanley verson <br />Project Engineer <br />cc: Earl Gilford, Motor Pool Division <br />// health4-lb <br />