Laserfiche WebLink
Mar -46-99 UtVpm From-TAIT & ASSO /TAIT ENVIR MGMT (TEW 7145606235 T-150 P 05105 F-293 <br />San Joaquin County of Public Works March 18, 19" <br />Workplan for Site Assessment <br />Task 4: Report Preparation <br />Upon completion of the field work and receipt of the analytical results, a report will be <br />prepared by TEM. The report will include soil boring logs, well permits, as -built construction <br />details of groundwater monitoring wells, analytical results of both soil and groundwater <br />samples, isoconcentration maps for TPH, benzene and MTBE, a groundwater contour map <br />depicting the hydraulic gradient and direction of groundwater flow across the SITE, and the <br />current groundwater elevation data. <br />w RO j DINflu'N" 15) SUM <br />The proposed work can be initiated upon written approval of the workplan by SJCPHS. A <br />final re:�ort besu �,.vk4 wift—,-4W%�fUlt�a7ffl ft'x <br />and receipt of all laboratory reports and disposal manifests. <br />Should you have any questions regarding this workplan, please contact any of the undersigni <br />at (714) 560-8200 at your convenience. <br />O32MM= <br />1 1111 1 i <br />I'Ll uvi� i �111 <br />< 4ardBar1le Richard L. Coff4'1`Ph.D., R. <br />Director Senior Geologist I <br />Attachments: Figure 1 - Site Plan with Proposed Well Locations <br />M:XTEM2NClicncs\SANJOAQUIN%,,anjoaquinworkplan.ckx: <br />0 <br />