My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:08:22 PM
Creation date
6/3/2020 9:45:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- 0 <br /> 2. Inoperative vapor pumps, as determined by the ARB Approved Installation, <br /> Operation and Maintenance Manual, constitute a defect. <br /> 3. For unihose dispensers, anymodifications or repair's to the nozzle, hanging <br /> hardware or vacuum pump done to bring one fuel grade WL into compliance at <br /> a fueling point invalidates the results of any previous fuel grade(s) tested before <br /> the alteration. All fuel grades at that fueling point shall be tested again to verify <br /> compliance. <br /> Inverted Coaxial Hoses <br /> 1. The maximum length of the hose assembly, including hose adaptor, whip hose, <br /> breakaway, flow limiter(optional) and inverted coaxial hose, measured at the base <br /> of the nozzle, shall be no more than twenty (20)feet. <br /> 2. Any hoseconfiguration is allowed. <br /> Breakaway CougliMs <br /> 1. Testing is required after reconnecting the breakaway to ensure proper operation <br /> and no observed leaks. The procedure for reconnecting breakaway and fueling <br /> point testing after a drive-off, referenced in Section 1.4 of Healy Systems <br /> Scheduled Maintenance, shall be conducted to verify that breakaway, hose and <br /> nozzle are operating properly after a drive-off. <br /> Flow Limiters <br /> 1. Flow limiter is mandatory when the flow rate is greater than 10.0 gallons per minute <br /> to comply with U.S. EPA requirement. <br /> Clean <br /> it Separator Pressure Management Sp_tem <br /> 1. The Clean Air Separator(CAS) is a passive gasoline storage tank ullage <br /> pressure management system, with no electrical requirements. The Clean Air <br /> Separator vapor integrity shall be evaluated using tetest procedure outlined in <br /> Exhibit 4 of this Executive Order. <br /> a. A Clean it Separator that fails the leak decay test outlined in <br /> Exhibit 4 shall be considered a defect. <br /> b. Unless there is maintenance ort si ing conducted on <br /> the Clean it Separator, the four ball valves shall be locked <br /> int positions shown in Figure 2113-2 or 213-211-11 for normal <br /> Clean Air Separator operation. Figure 213-2 applies to vertical <br /> CAS installations and Figure 2B-2H applies to horizontal CAS <br /> installations. A Clean Air Separator that is not in the proper <br /> operating configuration shall be considered a defect. <br /> Healy Systems, Inc. Phase 11 EV IR System, Exhibit 2-VR-201-H <br />
The URL can be used to link to this page
Your browser does not support the video tag.