My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:08:22 PM
Creation date
6/3/2020 9:45:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- 0 <br /> 2. The Clean Air Separator shall be installed within 100 feet from the vent line(s), <br /> and the associated piping shall be sloped 1/8" per foot minimum toward the vent <br /> line(s). <br /> Pressure/Vacuum Vent Valves for Gasoline Storacle Tank Vents <br /> 1. All PN vent valves shall be an ARB-certified PJV vent valve for a Phase I system. <br /> 2. At least one pressuretvacuum (PN) vent valve shall be installed on each <br /> gasoline storage tank vent. The maximum number of PJV vent valves allowed <br /> and PN vent valve performance specifications are listed in the applicable Phase <br /> I EVIR Executive Order. Vent lines may be manifold to minimize the number of <br /> PN vent valves and potential leak sources, provided the manifold conforms to all <br /> applicable fire regulations. At least one PN vent valve shall be installed on vents <br /> if a manifold is incorporated. Figure 2113-3 or 213-31-11 shows a typical manifold <br /> configuration for a single PN vent valve with the Clean it Separator. If two or <br /> more PN vent valves are desired, they all be installed in Darallel, so that each <br /> can serve as a backup tote other if one should fail to open properly. Figure <br /> 2113-4 or 213-41-1 shows a typical manifold configuration for two PJV vent valves <br /> installed in parallel with the Clean Air Separator. Figure 213-6 or 213-51-11 shows <br /> a typical manifold configuration for three PN vent valves installed in parallel with <br /> the Clean it Separator. Figure 213-6 or 2113-61-1 shows a typicalconfiguration for <br /> a PN vent valve mounted on a single 3" vent line with the Clean Air Separator. <br /> Figures 2131-3, 2B-4, 213-5 and 213-6 apply to vertical CAS installations. Figures <br /> 2B-31-1, 213-41-1, 213-51-1 and 213-61-11 apply to horizontal CAS installations. <br /> Vapor Recovery Piping Configurations <br /> NOTE: Woor Retum Pliging shall nieet the reguireffients soecified in <br /> section 4.11 o <br /> jgR-Z01. <br /> 1 Vapor Return and Vent Lines <br /> a. For facilities installed on or after April 1, 2003, all vapor return and vent <br /> lines shall be a minimum nominal internal diameter of 2 inches from the <br /> dispensers or the vent stacks tot first manifold. All lines after the first <br /> manifold and back tot underground storage tank shall have a minimum <br /> nominal internal diameter of 3 inches. <br /> Note: Facilities permitted by a local district prior to April 1, 2003 shall <br /> be required to meet the three inch diameter standard only upon <br /> facility modification requiring exposing at least 50 percent of the <br /> underground vapor return piping. <br /> Healy Systems, Inc. Phase 11 EVIR System, Exhibit 2-VR-201-H <br />
The URL can be used to link to this page
Your browser does not support the video tag.