My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:51:09 PM
Creation date
6/3/2020 9:45:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 21 12 04:45p Lower Sacramento Chevron 2099540582 p.4 <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY.PIPE TESTING <br /> Test Method Developed BY: X Piping Manufacturer D industry Standard 0 Professional Engineer <br /> [I Other{Spec) <br /> Test method Used: X Pressure U Vacuum C Bydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution-0-15PSI <br /> Ipiping Run fr I Piping Run#2 Piping Run 4 3 NPiping Run# <br /> Piping Material: Fiberglass -Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Pipiji Diameter: 3" 3" 31' <br /> 11 1--ength go, go, SW <br /> : Product Stored: Super Plus Regular <br /> mefliod and location of Test boot Test boot Test boot Test boot <br /> piping!run isolation: <br /> Wait time between applying- <br /> pressure/vawurn1water and5 min 5 min 5 min 5 min- <br /> startinR test, <br /> F"Test Start Time: 9:00 9:30 9:00 <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSt <br /> rest End Time: 10:00 10:30 10:00 <br /> Final Reading(Rr): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour 1 Hour I Hour I Hour <br /> Change in Reading(RF-R* 0 D 0 <br /> pass/Tail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: X Pass 0 Fail x Pass 0 Fail x Pass 0 Fail 0 Pass cValf j <br /> CommeLits—griciude informarion on re airs made prior to tesriK, and recomineridedfpl[ow-upfor failed tests) <br /> Had to install new shrader valves on test boots for premium and plus lines before testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.