Laserfiche WebLink
Oct 21 12 04:45p Lower Sacramento Chevron 2099540582 p.4 <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY.PIPE TESTING <br /> Test Method Developed BY: X Piping Manufacturer D industry Standard 0 Professional Engineer <br /> [I Other{Spec) <br /> Test method Used: X Pressure U Vacuum C Bydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution-0-15PSI <br /> Ipiping Run fr I Piping Run#2 Piping Run 4 3 NPiping Run# <br /> Piping Material: Fiberglass -Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Pipiji Diameter: 3" 3" 31' <br /> 11 1--ength go, go, SW <br /> : Product Stored: Super Plus Regular <br /> mefliod and location of Test boot Test boot Test boot Test boot <br /> piping!run isolation: <br /> Wait time between applying- <br /> pressure/vawurn1water and5 min 5 min 5 min 5 min- <br /> startinR test, <br /> F"Test Start Time: 9:00 9:30 9:00 <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSt <br /> rest End Time: 10:00 10:30 10:00 <br /> Final Reading(Rr): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour 1 Hour I Hour I Hour <br /> Change in Reading(RF-R* 0 D 0 <br /> pass/Tail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: X Pass 0 Fail x Pass 0 Fail x Pass 0 Fail 0 Pass cValf j <br /> CommeLits—griciude informarion on re airs made prior to tesriK, and recomineridedfpl[ow-upfor failed tests) <br /> Had to install new shrader valves on test boots for premium and plus lines before testing. <br />