Laserfiche WebLink
rules and regulations. All fire and life safety aspects must be acceptable to the local <br />fire chief. Permits to install the Veeder-Root Phase it balance EVR system may be <br />required by the San Joaquin Valley Air Pollution Control District and the Sacramento <br />Metropolitan Air Quality Management District (Districts) or other local agencies. In <br />addition Veeder-Root shall comply with all district permit conditions including testing <br />and maintenance. Veeder-Root shall provide the ARB and Districts with any special <br />procedures, equipment, or tools for conducting tests or maintenance specified in the <br />District permit. <br />2. The uncertified equipment that may be installed is listed below: <br />..:�.::: ;,=k`s� r: �.w:xr�.i�amu::.»E.:.::ra:wsS•ti"riY vis•}^ Sw <br />€;sr rS DescriQ#lons <br />.t; y.:xtu;k.= ..�em <br />Puma F <br />�}.f:: <br />ie• c..n�:^.Rrewa <br />rSecogda ,Mari <br />ifac user" <br />. � Y..: "�C.a,z;: qr. ._::tt�a: <br />.� Mode) f rit;" A <br />«i.i. '11-:sw ;tri9iL'.•t-s •: "=iw <br />( ,'Zt-_..::.. r "-r� : r. r•a, �; <br />'R:1•3.1' ti:Pa?G. sgl.i `: f;fj,:.yo-, ...:[f. <br />z.}pc i �•i`" <br />. <br />r <br />�. t b F.1:� <br />.XSa..:i.4 1 L'i" 1S <br />a� <br />' i• h .. 3:w•.e <br />^C <br />-'f.—.." y+.: ii: <br />. r i+ <br />+":� +:Wit,:• <br />a <br />`h.. -.r,.. ..: <br />�' :"ik< . fiij;`., '$s'i}_ • :.�. z ^ Iti <br />�'..f: <br />x}y� .•a <br />P'3: �f:_ ..:ft..t.. ....r. •..6.i-.� .K S}..:'�: <br />•"':atC,i� :;3c ::I:pL.• ,<.oICA: a::..ry . nn�n: .. <br />» ;f <br />:�..fE;.:lslt�I'f .}'..i <br />ey:<.:._. :_..._., r?:.hn <br />4ae`eV to ' <br />.u. x.-. .1. .. S>•.-- N%t+%'.v <br />:�t -f 6>� <br />;:✓. r.x-3.:xstf P-?l:Yfit • <br />.z :,.x�;rA.,._.3.y,��:bw..:.,5: <br />: ;k;:•^ <br />f.x riyi <br />t [j4'u�: . F %-�e..t,:..Y....:e.k:......k <br />l:-%:{ 1H G�fe;�yiRr:7'm'GFI::iyti.';ii::...r:u.rr.n.....,.r: •: r.. <br />Vapor Flow Meter <br />6 <br />N/A <br />Veeder-Root <br />332374-001 <br />Vapor Pressure <br />1 <br />N/A <br />Veeder-Root <br />331946-001 <br />Sensor <br />TLS -ISD Software <br />1 <br />N/A <br />Veeder-Root <br />ISD 1.01 <br />Nozzles <br />12 <br />12 <br />VST <br />VST-EVR-NB <br />Coaxial Hose <br />12 <br />12 <br />VST <br />VDV-XXX <br />Break -Away <br />12 <br />12 <br />VST <br />VSTA-EVR-SBK <br />Pressure Data <br />1 <br />N/A <br />Veeder Root <br />+5/-10 IWC <br />Logging System <br />Pressure <br />1 <br />N/A <br />Veeder-Root <br />Canister <br />Mana emerif <br />'Veeder-Root shall provide ARB with a written description of the pressure management system at least <br />10 days before installation. <br />3. If the above facilities are to be used as certification test sites, verification shall be <br />provided to demonstrate that the test site achieved a minimum throughput of <br />150,000 gallons of gasoline per month for six months preceding test site <br />designation. <br />4. Veeder-Root shall notify ARB and Districts of the installation date(s) so that ARB and <br />District staff has the opportunity to observe the installations. Veeder Root shall also <br />provide written notice to ARB and the Districts within ten days after the installation of <br />all components confirming that the system is operating properly and is ready for <br />testing to begin. <br />5. Veeder-Root shall provide ARB and the Districts a minimum of ten working days <br />notification before conducting testing at the test sites. All test data collected at the <br />test sites shall be provided to ARB within 15 days after testing. <br />