My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. UNDER-DISPENSER CONTAINMENT <br /> Test Method Developed By: ❑ UDC Manufacturer ®Industry Standard D Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑ Vacuum 0 Hydrostatic <br /> ❑ Other(.Specify) <br /> Test Equipment Used: Incon SumpTester Equipment Resolution: +/-0.00211 <br /> UDC UDC UDC# UDC# <br /> UDCManufacturer: <br /> UDC Material: <br /> UDC De the <br /> Height from UDC Bottom to Top <br /> of ffi est PipjRg Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested' <br /> Does turbine shut down when <br /> C sensor detects liquid(both ❑Yes❑No ENNA ❑Yes No ❑NA ❑Yes❑No ❑NA ❑Yes❑No ❑NA <br /> roduct and water?$ <br /> Turbine shutdown response time <br /> Is system ed for fail- <br /> safe shutdown? Yes❑No NA ❑Yes❑No ❑NA ❑Yes❑ o NA ❑Yes No ❑NA <br /> Was fail-safe verified to be ❑Yes❑No FE NA 0 Yes❑No ❑NA ❑Yes❑No ❑NA D Yes❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> swing test <br /> Test Start Time: <br /> Initial Reading(Rr): <br /> Test End Time: < <br /> Final Reading( F): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> TestResult; N Pass ❑Fail D Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes❑No H NA ❑Yes❑No ❑NA ❑Yes❑No ❑NA ❑Yes❑No ❑NA <br /> Was sensor properly replaced and ®Yes❑No NA ❑Yes❑No ❑NA ❑Yes❑No ❑NA ❑Yes❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include infartrrafir�n an repairs treads priar to testirr and recatta�rrded fattow-up for failed tests) <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to gay of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.