My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CECEIVED <br /> DEC 3 0 2016 <br /> 5.SECONDARY PIPE TESTING TT <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Prof T <br /> ❑ Other(Spec) <br /> Test Method Used: 0 Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> eexv;:7, *-e .aa.* :.: <br /> #� Piping Run#87 Piping Run#91 Piping Run#Diesel <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 100' 100' 100' <br /> Product Stored: Gasoline Gasoline Diesel <br /> Method and location of Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 1:30 pm 8:40 am <br /> Initial Reading(Rt): 5 psi 5 psi <br /> Test End Time: 2:30 pm 8:45 am <br /> Final Reading(RF): „)psi 0 psi <br /> Test Duration: 1 hr. I hr. <br /> Change in Reading(RF-RI): 3 psi t -5 psi <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss No detectable Loss No detectable Loss <br /> Criteria: <br /> Test Result: Pass ®Fail ❑ Pass 21 Fail 11 Pass 0 Fail ® Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 87, 91,&Diesel-torn test boots. <br />
The URL can be used to link to this page
Your browser does not support the video tag.