My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JIECEIVED <br /> DE C 3 0 2016 <br /> 6.PIPING SUMP TESTING ENVIRONMENTAL HEALTH <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Prof WT <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +1-0.002" <br /> STP Sump#87 STP Sump#91 STP Sump#Diesel <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 71" 72" 72" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 18" 19" 18" <br /> Highest PipjEg Penetration: <br /> Height from Tank Top to Lowest I6" 15" 16" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good <br /> Portion of Sump Tested' 2"above piping 2"above piping 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> product and water)?` <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> shutdown? <br /> Was fail-safe verified to be ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 11:00 am 11:00 am <br /> Initial Reading(RI): 5.4240 6.1849 <br /> Test End Time: 11:15 am 11:15 am <br /> Final Reading(RF): 5.4237 6.1845 <br /> Test Duration: 15 min. 15 min. <br /> Change in Reading(RF-RI): 0.0003 0.0004 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.00211 +/-0.00211 <br /> Test Result: El Pass ® Fail ® Pass ❑ Fail C Pass ® Fail ® Pass ❑ Fail <br /> Was sensor removed for testing? ❑Yes❑No 0 NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> Was sensor properly replaced and ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> verified functional after testing? 11 1 <br /> Comments—(include information on repairs made prior to testing, and recommended follow-y2 for failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> Diesel Sump-Torn test boot. <br /> t If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.