Laserfiche WebLink
7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ®Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec6) <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> . ,...r. . �. . . ,,... . e . . , . M._.v . . .am ...,. :, <br /> UDC#9l10 UDC#11/12rn IMM <br /> UDC Manufacturer: Bravo Bravo <br /> UDC Material: Steel Steel <br /> UDC Depth: 12" 12" 1..E L' 110 2016 <br /> Height from UDC Bottom to Top Bottom Bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Bottom Bottom ENVIRONMENTAL <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good <br /> testing: <br /> Portion of UDC Tested 2"above piping 2"above piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> product and water)?" <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- ❑yes❑No ®NA ❑Yes❑No ®NA <br /> safe shutdown?` <br /> Was fail-safe verified to be ®Yes❑No ®NA ❑Yes❑No ®NA <br /> op erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 3:21 pm 3:21 pm <br /> Initial Re1.6006 2.2700 <br /> Test End Time: 3:36 pm 3:36 pm <br /> Final Reading(RF): 1.6005 2.2696 <br /> Test Duration: 15 min. 15 min. <br /> Change in Readin RF-R,): 0.0001 0.0004 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.00211 <br /> Test Result: ® Pass ❑Fail ® Pass 0 Fail Ci Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes❑No®NA ❑Yes❑No®NA []Yes❑No®NA <br /> Was sensor properly replaced and ❑Yes❑No J@ NA ❑Yes❑No 0 NA []Yes❑No®NA <br /> verified ftinctional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />