My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> ITEC 3 0 2010 <br /> 7. UNDER-DISPENSER.CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ®Industry Standard ❑ RA14idA&N <br /> � g1 <br /> El Other(Spec) <br /> MENT <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 e. <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Steel Steel Steel Steel <br /> UDC Depth: 12" 12" 12" 12" <br /> Height from UDC Bottom to Top Bottom Bottom Bottom Bottom <br /> of Highest P!pi!lg Penetration: <br /> Height from UDC Bottom to Bottom Bottom Bottom Bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good Good Good <br /> testing: <br /> Portion of UDC Tested 2"above RiRin2"above piping 2"above piping 2"above piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> product and water)?. <br /> Turbine shutdown response time N/A N/A NIA N/A <br /> Is system programmed for fail- ❑yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> safe shutdown?` <br /> Was fail-safe verified to be ❑yes❑No 0 NA ❑Yes❑No 0 NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 1:16 pm 1:16 pm 2:18 pm 2:18 pm <br /> Initial Reading(RO: 1.3734 1.0952 0.3449 0.7096 <br /> Test End Time: 1:31 pm 1:31 pm 2:33 pra 2:33 pm <br /> Final Reading(RF): 1.3751 1.0953 0.3454 0.7072 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Chane in Reading(RF-R,): 0.0017 0.0001 0.0005 0.0024 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.00211 <br /> Test Result: ® Pass ®Fail ® Pass 0 Fail ® Pass ❑Fail n Pass ®Fail <br /> Was sensor removed for testing? ❑Yes❑No®NA ❑Yes❑No U NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> Was sensor properly replaced and ❑yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> verified functional after testing?____ <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> UDC 7/8 Failed(needs further investigating) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to gLny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.