My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer l <br /> []Other(Sped) <br /> Test Method Used Pressure Vacuum 0 Hydrostatic <br /> I ®Other(Speclfy) <br /> Test Equipment Used:Test reducer boots,idigrogen and gauges Equipment Resolution: 0.5%of span PSI <br /> ;,777777 7777 <br /> Piping Run#87 Piping Run#91 Piping Run Diesel iping Run# <br /> Piping Material: Fiberglass Fiber lass Fiberglass <br /> i Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3B1 T Sea <br /> Length of Piping Run: 100, 100` 1001 <br /> Product Stored: ;asoiine Gasoline Diesel <br /> Method and location of Reducer Boots/Fittings Reducer Boots/Pittings Reducer Boots/Fittings Reducer Boots/Fittings <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> I startiu test: <br /> Test Start Time: 10:05M 10:05AM 10:05M <br /> Initial Reading 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time: 11:05 11:05A 11:05AM <br /> Final Reading(RF): 5 PSI l5 PSI 5 PSI PSI <br /> i Test Duratian: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass ail Threshold or 0 0 0 0 <br /> Criteria: <br /> °festResult: 2 Pass ❑ affil r Pass DFail [3✓,Pass 0 hail ®Pass [Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Adjusted and cleaned Bravo hub seal to 87 secondary line. Retested. <br /> Replaced test boots to 91 and Diesel secondary lines. Retested. RECEIVED <br /> NOV 13 2017 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.