Laserfiche WebLink
4 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer l <br /> []Other(Sped) <br /> Test Method Used Pressure Vacuum 0 Hydrostatic <br /> I ®Other(Speclfy) <br /> Test Equipment Used:Test reducer boots,idigrogen and gauges Equipment Resolution: 0.5%of span PSI <br /> ;,777777 7777 <br /> Piping Run#87 Piping Run#91 Piping Run Diesel iping Run# <br /> Piping Material: Fiberglass Fiber lass Fiberglass <br /> i Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3B1 T Sea <br /> Length of Piping Run: 100, 100` 1001 <br /> Product Stored: ;asoiine Gasoline Diesel <br /> Method and location of Reducer Boots/Fittings Reducer Boots/Pittings Reducer Boots/Fittings Reducer Boots/Fittings <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> I startiu test: <br /> Test Start Time: 10:05M 10:05AM 10:05M <br /> Initial Reading 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time: 11:05 11:05A 11:05AM <br /> Final Reading(RF): 5 PSI l5 PSI 5 PSI PSI <br /> i Test Duratian: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass ail Threshold or 0 0 0 0 <br /> Criteria: <br /> °festResult: 2 Pass ❑ affil r Pass DFail [3✓,Pass 0 hail ®Pass [Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Adjusted and cleaned Bravo hub seal to 87 secondary line. Retested. <br /> Replaced test boots to 91 and Diesel secondary lines. Retested. RECEIVED <br /> NOV 13 2017 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />